1.6 KiB
1.6 KiB
ADDED Requirements
Requirement: Change-phone SHALL follow transactional full migration
The system SHALL rely on POST /api/c/v1/auth/change-phone to migrate all valid phone-asset associations in one transaction, and SHALL treat any failure as a rollback of the whole operation.
Scenario: Successful migration
- WHEN the old-phone code and the new-phone code are valid and no limit or conflict occurs
- THEN the change request SHALL succeed
- AND the response SHALL keep the existing shape (
phone,changed_at) - AND the user SHALL return to the previous page and the homepage SHALL refresh the bound state
Scenario: New number exceeds the association limit
- WHEN the new number would exceed 10 valid associated assets
- THEN the whole operation SHALL be rolled back
- AND the system SHALL display the backend copy: 该手机号最多关联10项有效资产
Scenario: New number conflicts with an existing same-asset relation
- WHEN the new number already has a valid association with an asset being migrated
- THEN the whole operation SHALL be rolled back
- AND the system SHALL display the backend copy: 新手机号已存在与待迁移资产相同的有效关联,换绑已回滚
Requirement: Change-phone failures SHALL keep the user on the page
The system SHALL stay on the change-phone page and show the backend error message when migration fails so the user can correct the input and retry.
Scenario: Migration failure with message
- WHEN
change-phonereturns a business error - THEN the page SHALL show the returned
msg - AND the page SHALL NOT navigate away