Files
huang 034f00e2e7 实现 IoT SIM 管理模块数据模型和数据库结构
- 添加 IoT 核心业务表:运营商、IoT 卡、设备、号卡、套餐、订单等
- 添加分佣系统表:分佣规则、分佣记录、运营商结算等
- 添加轮询和流量管理表:轮询配置、流量使用记录等
- 添加财务和系统管理表:佣金提现、换卡申请等
- 实现完整的 GORM 模型和常量定义
- 添加数据库迁移脚本和详细文档
- 集成 OpenSpec 工作流工具(opsx 命令和 skills)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-01-12 15:44:23 +08:00

5.2 KiB

name: OPSX: Archive description: Archive a completed change in the experimental workflow category: Workflow tags: [workflow, archive, experimental]

Archive a completed change in the experimental workflow.

Input: Optionally specify --change <name> after /opsx:archive. If omitted, MUST prompt for available changes.

Steps

  1. If no change name provided, prompt for selection

    Run openspec list --json to get available changes. Use the AskUserQuestion tool to let the user select.

    Show only active changes (not already archived). Include the schema used for each change if available.

    IMPORTANT: Do NOT guess or auto-select a change. Always let the user choose.

  2. Check artifact completion status

    Run openspec status --change "<name>" --json to check artifact completion.

    Parse the JSON to understand:

    • schemaName: The workflow being used
    • artifacts: List of artifacts with their status (done or other)

    If any artifacts are not done:

    • Display warning listing incomplete artifacts
    • Prompt user for confirmation to continue
    • Proceed if user confirms
  3. Check task completion status

    Read the tasks file (typically tasks.md) to check for incomplete tasks.

    Count tasks marked with - [ ] (incomplete) vs - [x] (complete).

    If incomplete tasks found:

    • Display warning showing count of incomplete tasks
    • Prompt user for confirmation to continue
    • Proceed if user confirms

    If no tasks file exists: Proceed without task-related warning.

  4. Check if delta specs need syncing

    Check if specs/ directory exists in the change with spec files.

    If delta specs exist, perform a quick sync check:

    a. For each delta spec at openspec/changes/<name>/specs/<capability>/spec.md:

    • Extract requirement names (lines matching ### Requirement: <name>)
    • Note which sections exist (ADDED, MODIFIED, REMOVED)

    b. Check corresponding main spec at openspec/specs/<capability>/spec.md:

    • If main spec doesn't exist → needs sync
    • If main spec exists, check if ADDED requirement names appear in it
    • If any ADDED requirements are missing from main spec → needs sync

    c. Report findings:

    If sync needed:

    ⚠️ Delta specs may not be synced:
    - specs/auth/spec.md → Main spec missing requirement "Token Refresh"
    - specs/api/spec.md → Main spec doesn't exist yet
    
    Would you like to sync now before archiving?
    
    • Use AskUserQuestion tool with options: "Sync now", "Archive without syncing"
    • If user chooses sync, execute /opsx:sync logic

    If already synced (all requirements found):

    • Proceed without prompting (specs appear to be in sync)

    If no delta specs exist: Proceed without sync-related checks.

  5. Perform the archive

    Create the archive directory if it doesn't exist:

    mkdir -p openspec/changes/archive
    

    Generate target name using current date: YYYY-MM-DD-<change-name>

    Check if target already exists:

    • If yes: Fail with error, suggest renaming existing archive or using different date
    • If no: Move the change directory to archive
    mv openspec/changes/<name> openspec/changes/archive/YYYY-MM-DD-<name>
    
  6. Display summary

    Show archive completion summary including:

    • Change name
    • Schema that was used
    • Archive location
    • Spec sync status (synced / not synced / no delta specs)
    • Note about any warnings (incomplete artifacts/tasks)

Output On Success

## Archive Complete

**Change:** <change-name>
**Schema:** <schema-name>
**Archived to:** openspec/changes/archive/YYYY-MM-DD-<name>/
**Specs:** ✓ Synced to main specs

All artifacts complete. All tasks complete.

Output On Success (No Delta Specs)

## Archive Complete

**Change:** <change-name>
**Schema:** <schema-name>
**Archived to:** openspec/changes/archive/YYYY-MM-DD-<name>/
**Specs:** No delta specs

All artifacts complete. All tasks complete.

Output On Success With Warnings

## Archive Complete (with warnings)

**Change:** <change-name>
**Schema:** <schema-name>
**Archived to:** openspec/changes/archive/YYYY-MM-DD-<name>/
**Specs:** ⚠️ Not synced

**Warnings:**
- Archived with 2 incomplete artifacts
- Archived with 3 incomplete tasks
- Delta specs were not synced (user chose to skip)

Review the archive if this was not intentional.

Output On Error (Archive Exists)

## Archive Failed

**Change:** <change-name>
**Target:** openspec/changes/archive/YYYY-MM-DD-<name>/

Target archive directory already exists.

**Options:**
1. Rename the existing archive
2. Delete the existing archive if it's a duplicate
3. Wait until a different date to archive

Guardrails

  • Always prompt for change selection if not provided
  • Use artifact graph (openspec status --json) for completion checking
  • Don't block archive on warnings - just inform and confirm
  • Preserve .openspec.yaml when moving to archive (it moves with the directory)
  • Quick sync check: look for requirement names in delta specs, verify they exist in main specs
  • Show clear summary of what happened
  • If sync is requested, use /opsx:sync approach (agent-driven)